The Great Pool and Spa Project
|
||
A view of the new patio from the back of the house. There will be one step down from the pool room. The wall/seat is visible on the right side. This work was done on 10/4/04. The patio could be finished on 10/5. Then mostly fixing the yard will remain. The pool room still needs to have lights installed (3 inside and 1 outside by the door).
|
||
Previous |
|