The Great Pool and Spa Project

 

A view of the new patio from the back of the house.  There will be one step down from the pool room.  The wall/seat is visible on the right side.  This work was done on 10/4/04.  The patio could be finished on 10/5.  Then mostly fixing the yard will remain.  The pool room still needs to have lights installed (3 inside and 1 outside by the door).

 

Previous

Pool Index