The Great Pool and Spa Project

 

The liner is installed and filling begins.  Two truckloads of water was delivered to help fill the pool.  The first day the pool was only filled about halfway to help set the liner.  The next step was to cut in the two sets of steps, the light, and the skimmer before filling the rest of the way.

 

Previous

Pool Index

Next